CCI - 1000
Water-Based Penetrating Hardener and Dustproofer VOC Compliant
DESCRIPTION
CCI-1000 is a unique water-based
non-acid solution with active silicates that is V.O.C. compliant.
CCI-1000 reacts with free lime and calcium carbonates, which produces
crystalline growth in the structure of the concrete. The unique
formulation of CCI-1000 will allow the surface to breathe. CCI-1000 will
work as a hardener and dustproofer. CCI-1000 will not interfere with the
bond of adhesive applied flooring materials.
BENEFITS...
back to top
-
One Component
-
Non-Yellowing
-
Easy Maintenance
-
Long Lasting
-
VOC Compliant
-
UV Resistant
-
Proven Quality
-
Helps Prevent Dusting
-
Easy to Apply
SUBSTRATES...
back to top
-
Concrete: New & Old
-
Most Masonry Surfaces
TECHNICAL DATA...
back to top
|
Color |
Clear |
|
V.O.C. |
None |
|
Coverage Rate |
200-300 sq. ft./gal. |
|
Ambering upon Exposure |
None |
|
Flammability |
Non-Flammable |
|
Application Temperature |
50 Degrees F Minimum |
|
Clean Up |
Water |
|
Dry Time |
1-3 Hours |
|
Do Not Freeze |
|
AVAILABILITY...
back to top
1- Gallon Units
5- Gallon Units 55- Gallon
Drums
SURFACE PREPARATION...
back to top
Do a small test in an
inconspicuous area before project starts to assure compatibility of all
products, and approval. If you have any questions regarding application
or the product, please call CCI at 1-800-511-2769. The surface must be
clean of all contaminates, oil, sealers, and waxes. CCI-1000 can only
react with clean concrete.
APPLICATION...
back to top
EXISTING CONCRETE
Do a small test in an inconspicuous
area before project starts to assure compatibility of all products, and
approval. Always do a small test first. Each concrete pad is different
and results may vary. Please read all direction before starting.
-
Thoroughly clean the concrete,
removing all old films, dirt, oil, and all containments.
-
The surface should be damp with
water but no puddles of water.
-
Apply CCI-1000 to surface by
spray or squeegee at 200-300 sq. ft./gal. depending on porosity of
concrete. The entire surface should be wet with CCI-1000.
-
Do not let CCI-1000 dry on the
concrete. Spray areas that are drying out with a light out of
CCI-1000. The best application tool is a pump up spray unit for
applying the product.
-
Broom out to an even coat
working the broom around to push or work product in the concrete
surface.
-
When material starts to gel on
the surface after approximately 30-40 minutes, (CAUTION - MATERIAL
WILL BECOME SLIPPERY UNDER FOOT. TAKE PROPER SAFETY ACTION), flush
the entire surface thoroughly with water, and squeegee off the
excess.
-
A second coat may be applied if
necessary and/or if a gloss is trying to be achieved.
-
If a second coat is being
applied, repeat steps 1-6.
-
If a white film starts to form,
flush immediately since all of the absorption and initial reaction
is complete.
-
The surface may be burnished
with a high-speed burnisher with a polyester stripping pad to help
aid in achieving a high gloss 4-5 hours after the last application.
-
The surface can be used as soon
as it is totally dry.
FRESHLY POURED CONCRETE
Do a small test in an inconspicuous
area before project starts to assure compatibility of all products, and
approval. Always do a small test first. Each concrete pad is different
and results may vary.
-
Thoroughly clean the concrete,
removing all old films, dirt, oil, and all containments.
-
The surface should be damp with
water but no puddles of water.
-
Apply CCI-1000 to surface by
spray or squeegee at 200-300 sq. ft./gal. depending on porosity of
concrete. The entire surface should be wet with CCI-1000.
-
Do not let CCI-1000 dry on the
concrete. Spray areas that are drying out with a light out of
CCI-1000. The best application tool is a pump up spray unit for
applying the product.
-
Broom out to an even coat
working the broom around to push or work product in the concrete
surface.
-
When material starts to gel on
the surface after approximately 30-40 minutes, (CAUTION - MATERIAL
WILL BECOME SLIPPERY UNDER FOOT. TAKE PROPER SAFETY ACTION), flush
the entire surface thoroughly with water, and squeegee off the
excess.
CONSTRUCTION AND CURING
SUGGESTIONS...
back to top
Chem-Coat
Industries Inc., recommend for proper construction and curing of a
concrete floor and slabs to follow the guidelines set forth by ACI
(American Concrete Institute) guide 302-1R-96 - Concrete Floor and Slab
Construction.
|
|