CCI - 1000 Water-Based Penetrating Hardener and Dustproofer VOC Compliant

 

DESCRIPTION

CCI-1000 is a unique water-based non-acid solution with active silicates that is V.O.C. compliant. CCI-1000 reacts with free lime and calcium carbonates, which produces crystalline growth in the structure of the concrete. The unique formulation of CCI-1000 will allow the surface to breathe. CCI-1000 will work as a hardener and dustproofer. CCI-1000 will not interfere with the bond of adhesive applied flooring materials.

 

BENEFITS... back to top

  • One Component

  • Non-Yellowing

  • Easy Maintenance

  • Long Lasting

  • VOC Compliant

  • UV Resistant

  • Proven Quality

  • Helps Prevent Dusting

  • Easy to Apply

 

SUBSTRATES... back to top

  • Concrete: New & Old

  • Most Masonry Surfaces

 

TECHNICAL DATA... back to top

Color

Clear

V.O.C.

None

Coverage Rate

200-300 sq. ft./gal.

Ambering upon Exposure

None

Flammability

Non-Flammable

Application Temperature

50 Degrees F Minimum

Clean Up

Water

Dry Time

1-3 Hours

Do Not Freeze

 

 


AVAILABILITY... back to top

1- Gallon Units        5- Gallon Units        55- Gallon Drums

 

SURFACE PREPARATION... back to top

Do a small test in an inconspicuous area before project starts to assure compatibility of all products, and approval. If you have any questions regarding application or the product, please call CCI at 1-800-511-2769. The surface must be clean of all contaminates, oil, sealers, and waxes. CCI-1000 can only react with clean concrete.

 

APPLICATION... back to top

EXISTING CONCRETE

Do a small test in an inconspicuous area before project starts to assure compatibility of all products, and approval. Always do a small test first. Each concrete pad is different and results may vary. Please read all direction before starting.

  1. Thoroughly clean the concrete, removing all old films, dirt, oil, and all containments.

  2. The surface should be damp with water but no puddles of water.

  3. Apply CCI-1000 to surface by spray or squeegee at 200-300 sq. ft./gal. depending on porosity of concrete. The entire surface should be wet with CCI-1000.

  4. Do not let CCI-1000 dry on the concrete. Spray areas that are drying out with a light out of CCI-1000. The best application tool is a pump up spray unit for applying the product.

  5. Broom out to an even coat working the broom around to push or work product in the concrete surface.

  6. When material starts to gel on the surface after approximately 30-40 minutes, (CAUTION - MATERIAL WILL BECOME SLIPPERY UNDER FOOT. TAKE PROPER SAFETY ACTION), flush the entire surface thoroughly with water, and squeegee off the excess.

  7. A second coat may be applied if necessary and/or if a gloss is trying to be achieved.

  8. If a second coat is being applied, repeat steps 1-6.

  9. If a white film starts to form, flush immediately since all of the absorption and initial reaction is complete.

  10. The surface may be burnished with a high-speed burnisher with a polyester stripping pad to help aid in achieving a high gloss 4-5 hours after the last application.

  11. The surface can be used as soon as it is totally dry.

 

FRESHLY POURED CONCRETE

Do a small test in an inconspicuous area before project starts to assure compatibility of all products, and approval. Always do a small test first. Each concrete pad is different and results may vary.

  1. Thoroughly clean the concrete, removing all old films, dirt, oil, and all containments.

  2. The surface should be damp with water but no puddles of water.

  3. Apply CCI-1000 to surface by spray or squeegee at 200-300 sq. ft./gal. depending on porosity of concrete. The entire surface should be wet with CCI-1000.

  4. Do not let CCI-1000 dry on the concrete. Spray areas that are drying out with a light out of CCI-1000. The best application tool is a pump up spray unit for applying the product.

  5. Broom out to an even coat working the broom around to push or work product in the concrete surface.

  6. When material starts to gel on the surface after approximately 30-40 minutes, (CAUTION - MATERIAL WILL BECOME SLIPPERY UNDER FOOT. TAKE PROPER SAFETY ACTION), flush the entire surface thoroughly with water, and squeegee off the excess.

 

CONSTRUCTION AND CURING SUGGESTIONS... back to top

Chem-Coat Industries Inc., recommend for proper construction and curing of a concrete floor and slabs to follow the guidelines set forth by ACI (American Concrete Institute) guide 302-1R-96 - Concrete Floor and Slab Construction.